What do I need to do to prep my site? Do I need stone put down before my shed is built? Acess?
The best way to prep your site and have it ready for us is a level crushed stone pad at least 8″ deep. It should be at least a foot larger than the shed footprint. I will go over those details with you in advance. If we’re building a very small shed on fairly level dry ground, site prep may not be necessary. Contact me with any site prep questions.
Site Access – I should have access for trailer and materials within 25′ of the shed site. I need access to electricity within 100′. If no electricity is available there may be a minimal charge for using a generator. If access is farther than 25′ let me know and we’ll figure it out.
Do I need a permit?
Every town can have different rules and regulations. Any permitting or zoning issues are the responsibility of the customer. That info usually can be found at your local town hall.
How do I figure the total cost of my shed?
What is your service area?
What payment methods do you accept?
You can pay for your shed with cash or check. There is a discount for cash payment
The normal lead time is 60 days. if you’re ready and the site is prepped let me know. i may be able to work you in the schedule sooner than later.